BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//7.4.5//EN
TZID:Europe/London
X-WR-TIMEZONE:Europe/London
BEGIN:VEVENT
UID:881@rchs.org.uk
DTSTART;TZID=Europe/London:20261024T140000
DTEND;TZID=Europe/London:20261024T160000
DTSTAMP:20260820T172751Z
URL:https://rchs.org.uk/events/the-development-of-hs2-ray-shill/
SUMMARY:The Development of HS2   (Ray Shill)
DESCRIPTION:Ray’s talk will follow the history of the project from incept
 ion to the present-day\, considering examples of work carried out as well 
 as abandoned aspects such as the extensions to Leeds and Manchester.  In 
 2026 there has been significant progress with the infrastructure and plans
  are now being made for laying track and testing on a trial section. A fea
 ture of the work has been the use of road contractors’ vehicles and the
  making of temporary roads to assist construction - a system similar to mo
 torway construction and very unlike the old method of employing contractor
 s’ railways. The more expensive mode of construction adopted for HS2 is
  a core element in this talk\, as are the political decisions that have af
 fected what is now being built.
CATEGORIES:West Midlands
LOCATION:The Birmingham & Midland Institute\, 9 Margaret Street\, Birmingha
 m\, West Midlands\, B3 3BS\, England
GEO:52.481501;-1.90378
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=9 Margaret Street\, Birming
 ham\, West Midlands\, B3 3BS\, England;X-APPLE-RADIUS=100;X-TITLE=The Birm
 ingham & Midland Institute:geo:52.481501,-1.90378
END:VEVENT
BEGIN:VTIMEZONE
TZID:Europe/London
X-LIC-LOCATION:Europe/London
BEGIN:DAYLIGHT
DTSTART:20260329T020000
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR